Sign In | Join Free | My hardware-wholesale.com
China Zhenjiang Great Wall Group Co.,Ltd logo
Zhenjiang Great Wall Group Co.,Ltd
Best Goods, your smartest choice! Great Wall Products, The Great Wall Quality!
Active Member

9 Years

Home > Bailey Bridge >

Walkway bridge/ pedestrian bridgesidewalk/ steel pedestrian bridge/ Meeting ASTM GR65 Standard

Zhenjiang Great Wall Group Co.,Ltd
Contact Now

Walkway bridge/ pedestrian bridgesidewalk/ steel pedestrian bridge/ Meeting ASTM GR65 Standard

Brand Name : Great Wall

Model Number : CB100(CB321)

Certification : ISO,CE,SGS

Place of Origin : China

Price : Negotiated

Payment Terms : TT LC

Supply Ability : 10,000TON each year

Delivery Time : Depending on the quantity

Packaging Details : Containers(20GP,40HC) Or In Bulks

MOQ : 1 Set

Grade : JT-T 728-2008

Type : Heavy

Application : Steel Structure Bridge

Standard : ASTM|BS|DIN|GB

Contact Now

Because of the advantages of fast erection and light structure of the assembled steel bridge, it can be used as a city pedestrian bridge. Beautiful and affordable. It's the first choice for many customers.
Product attributes
Name: Assembled Pedestrian Bridge
Nicknames: sidewalk; steel pedestrian bridge; urban pedestrian bridge; steel pedestrian bridge; temporary sidewalk; temporary sidewalk; Bailey pedestrian bridge;
Model: 321; 200; GW D; Special steel truss, etc.
Commonly used truss plate models: 321 type Bailey film, 200 type Bailey film, GW D type Bailey film, etc.
Maximum single span of steel bridge design: about 60 meters
Standard lane width of steel bridge: 1.2 meters, 1.5 meters, 2 meters or customized according to demand.
Load grade: Crowd load or small vehicle traffic. Generally not more than 5 tons.
Design scheme: According to the different spans and loads, select the appropriate arrangement.
Main Material of Steel Bridge: GB Q345B
Connection pin material: 30CrMnTi
Connection bolt grade: 8.8 grade high strength bolt; 10.9 grade high strength bolt.
Surface anti-corrosion: hot-dip galvanizing; paint; heavy-duty anti-corrosion paint for steel structure; asphalt paint; anti-skid aggregate treatment for bridge deck, etc.
Bridge erection methods: cantilever push-out method; in-situ assembly method; pile-up construction method; hoisting method; floating transportation method, etc.
Installation time: 3-7 sunny days after abutment and other conditions are met (determined by bridge length and site conditions)
Installation requirements: 5-6 workers (determined according to site conditions)
Installation equipment: crane, hoist, jack, hand hoist, welding machine, generator, etc. (adjustable according to site conditions)
Features of steel bridge: low cost, beautiful appearance, light fitting, rapid assembly, interchangeable, removable, long service life
Certification: ISO, CCIC, BV, SGS, CNAS, etc.
Implementation criteria: JT-T/728-2008
Manufacturer: Zhenjiang Great Wall Heavy Engineering Technology Co., Ltd.
Annual output: 12,000 tons


China Walkway bridge/ pedestrian bridgesidewalk/ steel pedestrian bridge/ Meeting ASTM GR65 Standard wholesale

Walkway bridge/ pedestrian bridgesidewalk/ steel pedestrian bridge/ Meeting ASTM GR65 Standard Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhenjiang Great Wall Group Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)